Q345 Carbon Steel Welded Tube/Pipe

Q345 Carbon Steel Welded Tube/Pipe

Payment Term:TT,L/C,etc
Price Term:Ex-Work,FOB,CNF,CFR,etc
MOQ:1Ton
Delivery Time:Usually 7-30days, or upon negotiation
Loading Port:TIANJIN,SHANGHAI,DALIAN ,QINGDAO,etc
Package:Standard export package,such as wooden box or as required.
Samples:Free samples are provided but the freight is borne by the buyer

Certification

Product Details


Material GradeQ235A,Q235B、0Cr13、1Cr17、00Cr19Ni11、1Cr18Ni9、0Cr18Ni11Nb、
16Mn、20#、Q345、L245、L290、40#、60#、X42、X46、X70、X80 and etc
StandardGB,JIS,ASTM,BS,DIN,...
Technique Hot rolled/Cold rolled /Cold drawn /Seamless/Erw
SurfaceCoated /Galvanized /Black
OD5mm-630mm
Thickness0.25mm-75mm
UsageOil/Gas pipe ,Aerospace use,Machine parts Furnace ,Geological exploration,Acid resistance ,Bearing
CertificationISO9001, SGS, BV,CE...
Trade TermsEXW,FOB,CIF CFR
Loading PortTIANJIN,SHANGHAI,DALIAN QINGDAO,etc
Payment terms1) 30% deposit by T/T, the balance against copy of B/L by T/T.
2) 30% deposit by T/T, the balance by L/C at sight.
3) 100% L/C at sight.
MOQ1Ton
Packing DetailStandard export package: Wooden pallet +paperboard +steel strip Customized requirements are accepted
Delivery timeUsually 7-15 days, or upon negotiation
SamplesFree samples are provided but the fright is borne by the buyer

Product Material


GradeCSiMnPSCuCrNi
Cor-ten A0.120.25-0.750.20-0.500.01-0.20.030.25-0.550.5-1.250.65
Cor-ten B0.160.3-0.50.8-1.250.030.030.25-0.400.4-0.65≤0.4
SPA-H0.120.2-0.750.60.07-0.150.0350.25-0.550.3-1.250.65
9CuPCrNi-A0.120.2-0.750.20-0.500.07-0.150.040.25-0.550.3-1.250.65
Q235NH0.130.10-0.400.20-0.600.030.030.25-0.550.40-0.800.65
Q295NH0.150.10-0.500.30-1.000.030.030.25-0.550.40-0.800.65
Q355NH0.160.50.50-1.500.030.030.25-0.550.40-0.800.65
Q415NH0.120.651.10.0250.030.20-0.550.30-1.250.12-0.65
Q460NH0.120.651.50.0250.030.20-0.550.30-1.250.12-0.65
Q500NH0.120.6520.0250.030.20-0.550.30-1.250.12-0.65
Q550NH0.120.6520.0250.030.20-0.550.30-1.250.12-0.65
Q265GNH0.120.10-0.400.20-0.500.07-0.120.020.2-0.450.30-0.650.25-0.50
Q295GNH0.120.10-0.400.20-0.500.07-0.120.020.25-0.450.30-0.650.25-0.50
Q310GNH0.120.25-0.750.20-0.500.07-0.120.020.25-0.550.30-1.250.65
Q355GNH0.120.20-0.7510.07-0.150.020.25-0.550.30-1.250.65
Q345GNHL0.120.25-0.750.20-0.500.07-0.150.0350.25-0.550.30-0.650.65
Q295GQR20.120.10-0.400.20-0.500.06-0.120.020.25-0.450.30-0.650.25-0.5
Q295GQR30.120.20-0.400.25-0.550.06-0.120.020.25-0.50------
Q345NQR20.120.25-0.750.20-0.500.06-0.120.020.25-0.500.3-1.250.12-0.65
Q345NQR30.120.20-0.500.25-0.700.06-0.120.020.25-0.50------
Q400NQR10.120.751.10.0250.0080.25-0.550.3-1.250.12-0.65
Q450NQR10.120.751.50.0250.0080.25-0.550.3-1.250.12-0.65
Q500NQR10.120.7520.0250.0080.25-0.550.3-1.250.12-0.65
Q550NQR10.160.7520.0250.0080.25-0.550.3-1.250.65

Certificate

FAQ

How can I get a quotation from you ?
You can leave us message, and we will reply every message in time . Or we may talk on line by Trademanager. 


What are the delivery terms?
 Ex factory price, FOB price, CIF price, freight and freight

 

What are the packaging conditions?
Usually, we use rods or belts to pack the goods into bundles or rolls, and we can also pack the goods according to the customer's requirements.

 

What is your delivery time?
For inventory, we can ship the goods to the loading port within 7 days after receiving your deposit. For the production period, it usually takes 15-30 days after receiving the deposit.

Previous page:Already the First
Next page:Already the Last

Related Suggestion

Online Consultation

Submit