Z40 Galvanized Coil/Strip

Z40 Galvanized Coil/Strip

Payment Term:TT,L/C,etc
Price Term:Ex-Work,FOB,CNF,CFR,etc
MOQ:1Ton
Delivery Time:Usually 7-30days, or upon negotiation
Loading Port:TIANJIN,SHANGHAI,DALIAN ,QINGDAO,etc
Package:Standard export package,such as wooden box or as required.
Samples:Free samples are provided but the freight is borne by the buyer

Certification

Product Details


Item nameGalvanized steel coil
GradeSGCC,SGCD,SGCE,DX51D+Z,DX52D+Z,DX53D+Z,DX54D+Z,DX56D+Z,S250GD+Z,S280GD+Z,S350GD+Z,S550GD+Z
Thickness0.12 ~ 3.00 mm (cold rolled)
1.20 ~ 4.60 mm (Hot-rolled )
Width10 - 600 mm (strip)
600 - 1250 mm (coil)
ToleranceThickness: ±0.01 mm
Width: ±2 mm
Coil ID508 mm - 610 mm
Coil weight3 - 8 ton or as client requirement.
Zinc coating30g - 275g / m2
SpangleBig spangle,Regular spangle,Mini spangle,Zero spangle
Surface treatmentOil,Passivation, Chromated, Skin-passed, Anti-finger Print
ApplicationWidely used in road, railway, civil construction, water conservancy construction;
all kinds of machinery, electrical appliances,window protection and aquaculture, etc.
PackageStandard export package (Plastic film in the first layer,second layer is Kraft paper.
Third layer is galvanized sheet)
Delivery timeWithin 15 workdays after deposit received
RemarksInsurance per to Contract terms;MTC will be handed on with shipping documents;
We accept the third party certificatation test.

Product Material


bse metal typeGradeCHEMICAL COMPOSITION %
CSiMnP
cold rolled steel sheetDC51D+Z (St01Z, St02Z, St03Z) , DC51D+ZF≤0.10-≤0.50≤0.035
DC52D+Z (St04Z), DC52D+ZF≤0.08-≤0.45≤0.030
DC53D+Z (St05Z), DC53D+ZF≤0.08-≤0.40≤0.030
DC54D+Z (St06Z), DC54D+ZF≤0.01≤0.10≤0.30≤0.025
DC56D+Z (St07Z), DC56D+ZF≤0.01≤0.10≤0.30≤0.025
hot rolled steel sheetDD51D+Z (St01ZR, St02ZR)≤0.10-≤0.50≤0.035
DD54D+Z (St06ZR)≤0.01≤0.10≤0.30≤0.025

Certificate

FAQ

How can I get a quotation from you ?
You can leave us message, and we will reply every message in time . Or we may talk on line by Trademanager. 


What are the delivery terms?
 Ex factory price, FOB price, CIF price, freight and freight

 

What are the packaging conditions?
Usually, we use rods or belts to pack the goods into bundles or rolls, and we can also pack the goods according to the customer's requirements.

 

What is your delivery time?
For inventory, we can ship the goods to the loading port within 7 days after receiving your deposit. For the production period, it usually takes 15-30 days after receiving the deposit.

Previous page:Already the First
Next page:Already the Last

Related Suggestion

Online Consultation

Submit